Assigning a Sample-Drawing Procedure to a Task List 

Prerequisites

You have already created the task list(s) you intend to use with the sample-drawing procedure and the task list(s) contains at least one required characteristic.

The procedure for assigning a sample-drawing procedure to a task list is essentially the same for all task list types (for example, for an inspection plan, a routing, or a master recipe). The procedure below describes the how to assign a sample-drawing procedure to an inspection plan. For routings or master recipes, refer to the appropriate functions for creating or changing a routing or master recipe.

Procedure

  1. Choose Logistics ® Quality management ® Quality planning ® Inspection planning ® Inspection plan ® Create or Change.

The initial screen for creating or changing an inspection plan appears.

  1. Enter the necessary data to call up an inspection plan in the create or change mode.
  2. In the inspection plan, choose the function to display the inspection plan header.
  3. In the Inspection points field, enter a value that specifies inspection points for physical samples and then choose Continue.

The field for a sample-drawing procedure appears below the field for the inspection points.

  1. Enter the key for the sample-drawing procedure that you want to assign to the inspection plan.
  2. Save the data.

When you save the data, the system automatically executes a consistency check for the inspection plan. The system issues a warning message:

Result

The functions for sample management are active for the materials assigned to the inspection plan.