Changes to Task Lists 

Use

You use this function to change existing inspection plans or reference operation sets.

Changes to task lists are not included in existing inspection lots.

Prerequisites

You can change an inspection plan and a reference operation set with one of the following:

Features

Changing Without a Change Number

If you change a task list and enter a date in the Key date field on the initial screen,

Changing with a Change Number

To change a task list with a change number, enter a change master record number in the Change number field on the initial screen of the change function.

When you change a task list with a change master record,

Maintaining a Revision Level for a Task List

If your company maintains several versions of a material that are only distinguished by revision levels, you can create and edit corresponding inspection plan variants for these materials. In this way, the system can automatically select the appropriate inspection plan for an inspection, whenever such a material is subject to a goods receipt inspection.

Creating Change Documents

You use the change document function to record changes to inspection plans. The change documents are listed in chronological order. In the change document, changes are structured according to task list level (header, operation, inspection characteristic).

Activities

Changing with a Change Number

Changing Without a Change Number