Recording Inspection Results using a List
Use
You can use this procedure to record inspection results for the following objects:
Procedure
To |
Choose |
What you should know |
Record results for an inspection lot |
Logistics ® Quality management ® Quality inspection ® Worklist ® Variants for results recording ® Using a list |
Enter the desired selection criteria. Depending on your selection criteria (for example, Inspection start), the list can also include inspection points, physical samples, equipment or functional locations. |
Record results for physical samples |
Logistics ® Quality management ® Quality inspection ® Worklist ® Variants for results recording ® For physical samples |
Enter the desired selection criteria. |
Record results for equipment |
Logistics ® Quality management ® Test equipment management ® Calibration inspection ® Inspection results ® Worklist |
Enter the desired selection criteria. |
Record results for functional locations |
Logistics ® Quality management ® Test equipment management ® Calibration inspection ® Inspection results ® For a functional location ® Worklist |
Enter the desired selection criteria. |
A list of characteristics for the inspection lots appears that correspond to the entered selection criteria.
For an
inspection lot with inspection points, the inspection point number is included in the hierarchical structure.
For inspection lots, you can call up results recording at operation or characteristic level. For inspection points, physical samples, equipment, and functional locations, you can call up results recording directly by double-clicking on the respective object or at characteristic level.

If you record results for an inspection point (in production or at goods receipt), physical sample, or equipment/functional location, you close the respective inspection point.
The field Inspection point completion at the operation level of the task list controls whether inspection point closure is manual or automatic. A Customizing setting controls automatic valuation. When you valuate manually, a dialog box for results valuation and the confirmation of inspection point data appears after you close all characteristics. For more information, see
Recording Results for Inspection Points.
Result
After you have processed the characteristics for an operation, the system displays the following on the screen:

When you double-click on the corresponding inspection lot, you can switch to the usage decision.