Show TOC
Maintain Cost
Element Groups
In this IMG activity you create new or maintain
existing
cost element groups.
You can combine similar
cost elements into cost element groups. Similar cost element
groups can be combined to form other cost element groups so as to build a cost
element hierarchy.
You can use cost element groups:
- In the information system
The row structure of
your report is determined by the cost element structure. You can create totals
for each node in the report.
- When processing of several cost elements in
one transaction, such as
If, for example, you
wish to display and plan personnel costs in one work transaction, select the
group "Personnel costs".
- Report totalling takes place via cost element
group nodes. To achieve a clear illustration, each node on a level must have
the same number of subordinate levels.
Requirements
- In Customizing for Financial
Accounting (under General Ledger
Accounting -> G/L Accounts -> Master Data) you have
maintained a
chart of accounts.
Standard
settings
Standard cost element group
OAS-INT is created for
chart of accounts INT (international chart of accounts) in
controlling area 0001.
Activities
1. Check
whether the standard cost element groups meet your requirements.
2. Enter the
group to be created or changed and choose "Enter".
3. In the
structure screen, select the node from which the group is to be extended and
choose "Same level" or "Lower level".
Data fields appear
at the selected location in the tree structure.
4. Enter a name
and a text for the new node.
5. Confirm by
choosing "Accept changes".
6. To assign
values to an end node, select the node and choose "Insert value".
Data fields appear
in the tree structure.
7. Enter a
"From" value and, if necessary, a "To" value.
8. Confirm by
choosing "Accept changes".
The selected values
appear together with the name.
Notes on Group Maintenance
Notes on Copying Groups
Notes on
transport
A separate activity for
transporting cost element groups exists in the IMG under
General Controlling.
Note on
Validity Period
Note that groups have no validity periods. On
the other hand, most master data is time-based.
Further
notes
For more information about creating cost
element groups, see the "SAP Library" under Financials -> CO
Controlling -> Cost Center Accounting -> Processing Master
Data and Cost Elements -> Cost Element
Groups.