Define control key

Using the control key of the operation you determine

The most important functions are:

With this indicator you control whether the operation is scheduled
With this indicator you control whether capacity requirements records are written for the operation
With this indicator you control whether inspection characteristics have to be maintained for the operation
With this indicator you determine that the yield quantity is posted to the warehouse automatically when the operation is confirmed
With this indicator you control whether the operation is to be taken into account in costing.
With this indicator you control whether the operation is to be processed externally.
You can use indicators to control whether time tickets or completion confirmation slips should be printed for an operation
With this indicator you control

Actions

Check the existing control keys.