Features
– external
planning with planning tables– mass processing with
EXTERNPLAN
– full routings
– rough routings with capacity groups
– full BOMs
– rough BOMs
– rough-cut planning profiles
– sales figures
– production figures
– target stock levels
– target day’s supply

If the external system is not capable of processing the target stock levels and target day’s supply, the stock policies must be calculated in standard SOP. The same applies to aggregation and disaggregation of product groups. Should that be the case, only single level planning can be carried out in the external system.
For detailed information on standard SOP activities, see PP Sales & Operations Planning.