E1AFKOL
Field |
Description |
Type |
Length |
AUFNR |
Order number |
char |
12 |
APRIO |
Order priority |
char |
4 |
APROZ |
Scrap quantity in percent |
dec |
7 |
AUART |
Order type |
char |
4 |
AUFLD |
Explosion date for the bill of material and routing |
dats |
8 |
AUTYP |
Order category |
numc |
2 |
BAUMNG |
Quantity to which all component quantities in a bill of material refer |
quan |
14 |
BMEINS |
Unit of measure in which the material’s stocks are managed |
unit |
3 |
BMENGE |
Quantity to which all component quantities in a bill of material refer |
quan |
14 |
CY_SEQNR |
Number that can be assigned to the production orders or planned orders at header level and is valid for all operations in an order |
numc |
14 |
DISPO |
Number of the MRP controller or MRP controller group |
char |
3 |
FEVOR |
Production scheduler |
char |
3 |
FHORI |
Key used to determine the required float times for scheduling |
char |
3 |
FLG_MLTPS |
Indicator specifying that several co-products are created with the order |
char |
1 |
FREIZ |
Release period in days |
numc |
3 |
FTRMI |
Release date |
dats |
8 |
FTRMS |
Scheduled release date |
dats |
8 |
GAMNG |
Total quantity, including scrap, to be produced in this order |
quan |
14 |
GASMG |
Total scrap quantity resulting during production of the total production order quantity |
quan |
14 |
GETRI |
Date when the last operation was confirmed |
dats |
8 |
GEUZI |
Confirmed order finish (time) |
tims |
6 |
GLTRI |
Actual finish date |
dats |
8 |
GLTRP |
Time when the produced quantity is available |
dats |
8 |
GLTRS |
Scheduled finish |
dats |
8 |
GLUZP |
Latest finish of execution time for the order |
tims |
6 |
GLUZS |
Time when execution of the order is to finish |
tims |
6 |
GMEIN |
Common unit of measure for all order items |
unit |
3 |
GSTRI |
Date when the order is started (actual start date) |
dats |
8 |
GSTRP |
Earliest date when execution of the order can start (basic start date) |
dats |
8 |
GSTRS |
Date when execution of the order is to start (scheduled start date) |
dats |
8 |
GSUZP |
Earliest execution time |
tims |
6 |
GSUZS |
Time when execution of the order is to start (scheduled start time) |
tims |
6 |
IASMG |
Scrap that was previously confirmed at order header level |
quan |
14 |
IMNG |
Yield that was previously confirmed at order header level |
quan |
14 |
LODIV |
The lot size divisor indicates the value that must be used to divide the production order lot size without a remainder |
quan |
14 |
MATNR |
Material number for orders |
char |
18 |
PLAUF |
Date when the planned order is carried out |
dats |
8 |
PLGRP |
Key identifying the planner group responsible for maintaining the task list |
char |
3 |
PLNAL |
This key together with the group uniquely identifies a task list |
char |
2 |
PLNME |
Unit of measure of the material to be produced in the task list |
unit |
3 |
PLNNR |
Key uniquely identifying a (task list) group |
char |
8 |
PLNTY |
Key distinguishing task lists by their functionality |
char |
1 |
PLSVB |
Upper limit of the lot size range in the task list |
quan |
14 |
PLSVN |
Lower limit of the lot size range in the task list |
quan |
14 |
REDKZ |
Key indicating the reduction level used in scheduling |
char |
1 |
RGEKZ |
Indicator specifying that the material component is backflushed |
char |
1 |
RMNGA |
Quantity that must be reworked due to faulty processing or lacking quality |
quan |
14 |
SBMEH |
Quantity in which the material’s stocks are managed (base unit of measure) |
unit |
3 |
SBMNG |
Quantity to which all component quantities in a bill of material refer |
quan |
14 |
SICHZ |
Number of workdays used as the float after production in this order |
numc |
3 |
SLSBS |
Upper limit of the lot size range for the bill of material |
quan |
14 |
SLSVN |
Lower limit of the lot size range for the bill of material |
quan |
14 |
STLAL |
Identification of a bill of material within a BOM group |
char |
2 |
STLAN |
Key specifying the enterprise area in which the bill of material can be used |
char |
1 |
STLNR |
Number along with the BOM category which uniquely identifies a bill of material or BOM group |
char |
8 |
TERKZ |
Scheduling type |
char |
1 |
VORKZ |
Number of workdays used as the float before production in this order |
numc |
3 |
WERKS |
Key uniquely identifying a plant |
char |
4 |
E1AFPOL
Field |
Description |
Type |
Length |
POSNR |
Number of the order item |
numc |
4 |
AMEIN |
Unit in which the material to be produced is managed in the order |
unit |
3 |
BMENG |
Item quantity that the system confirms for shipping after checking the material availability |
quan |
14 |
DFREI |
Indicator specifying that the order is released or partially released |
char |
1 |
KDAUF |
Sales order number |
char |
10 |
KDEIN |
Schedule line of the sales order |
numc |
4 |
KDPOS |
Item number within a sales order |
numc |
6 |
LGORT |
Number of the storage location within a plant where the material is stored |
char |
4 |
MATNR |
Material number |
unit |
18 |
MEINS |
Unit of measure in which the material stocks are produced |
unit |
3 |
PLNUM |
Number of the planned order |
char |
10 |
PSAMG |
Item scrap quantity |
quan |
14 |
PSMNG |
Item quantity in the order |
quan |
14 |
SAFNR |
Run schedule header nummer |
char |
12 |
SERNR |
The serial number indicates the production series |
char |
8 |
UMREN |
Denominator for converting to base units of measure |
dec |
7 |
UMREZ |
Numerator for converting to base units of measure |
dec |
7 |
VERID |
Key specifying the various production techniques that can be used to produce a material |
char |
4 |
WEBAZ |
Number of workdays required for checking and storage after goods are received |
dec |
5 |
WEMNG |
Quantity previously produced for the order item and updated as goods received |
quan |
14 |
E1AFFLL
Field |
Description |
Type |
Length |
APLZL |
Field indicating the current sequence in the production order (standard or alternative sequence) |
numc |
8 |
AUSCHL |
Controls the alignment of dates in a parallel sequence |
char |
1 |
FLGAT |
Key indicating a standard sequence, parallel sequence or alternative sequence |
char |
1 |
LOSBS |
Upper limit of the lot size range for the sequence |
quan |
14 |
LOSVN |
Lower limit of the lot size range for the sequence |
quan |
14 |
LTXA1 |
First line of text in the operation description |
char |
40 |
PLNFL |
Sequence of operations in a routing |
char |
6 |
VORNR1 |
Branch operation number |
char |
4 |
VORNR2 |
Return operation number |
char |
4 |
E1AFVOL002 and E1AFUVL002
Field |
Description |
Type |
Length |
VORNR |
Operation number |
char |
4 |
UVORN |
Sub-operation number |
char |
4 |
ABLIPKZ |
Indicates that teardown and wait occur simultaneously |
char |
1 |
ABRUE |
Teardown |
fltp |
22 |
ANZZL |
Number of the capacity required for the calculation of duration or work |
int1 |
3 |
ARBEH |
Unit of work |
unit |
3 |
ARBEI |
Work completed when carrying out the operation |
quan |
8 |
ARBID |
Internal number used together with the object type to identify the operating resource |
numc |
8 |
ARUZE |
Unit used to calculate teardown |
unit |
3 |
AUFAK |
Planned scrap from the operation in percent |
dec |
7 |
BEARZ |
Processing time |
char |
22 |
BEAZE |
Unit for processing time |
unit |
3 |
BMSCH |
Quantity of the material to be produced to which the standard values refer |
quan |
14 |
CY_SEQNRV |
Number that can be assigned to an operation in a production order |
numc |
14 |
DAUNE |
Time unit for normal duration of an operation |
unit |
3 |
DAUNO |
Value for normal duration of an operation |
quan |
6 |
DAUME |
Time unit for minimum duration of an operation |
unit |
3 |
DAUMI |
Value for minimum duration of an operation |
quan |
6 |
FLIES |
Indicates continuous flow production |
char |
1 |
FSAVD |
Earliest scheduled start of execution (date) |
dats |
8 |
FSAVZ |
Earliest scheduled start of execution (time) |
tims |
6 |
FSEDD |
Earliest scheduled finish of execution (date) |
dats |
8 |
FSEDZ |
Earliest scheduled finish of execution (time) |
tims |
6 |
FSELD |
Earliest scheduled finish of wait (date) |
dats |
8 |
FSELZ |
Earliest scheduled finish of wait (time) |
tims |
6 |
FSEVD |
Earliest finish of the operation (date) |
dats |
8 |
FSEVZ |
Earliest finish of the operation (time) |
tims |
6 |
FSSAD |
Earliest scheduled start of teardown (date) |
dats |
8 |
FSSAZ |
Earliest scheduled start of teardown (time) |
tims |
6 |
FSSBD |
Earliest scheduled start of processing (date) |
dats |
8 |
FSSBZ |
Earliest scheduled start of processing (time) |
tims |
6 |
FSSLD |
Earliest scheduled start of wait (date) |
dats |
8 |
FSSLZ |
Earliest scheduled start of wait (time) |
tims |
6 |
KALID |
Number of the factory calendar |
char |
2 |
LAR01-LAR06 |
Activity type |
char |
6 |
LIEGZ |
Wait time used in scheduling |
fltp |
22 |
LIGZE |
Unit of wait time |
unit |
3 |
LMNGA |
Yield confirmed for this operation |
quan |
14 |
LTXA1 |
First line of text in the operation description |
char |
40 |
MEINH |
Operation unit of measure |
unit |
3 |
MINWE |
Minimum quantity that must be sent ahead when operations overlap |
quan |
14 |
MGVRG |
Operation quantity |
quan |
14 |
PVZNR |
Operation number of the superior operation for the phase |
char |
4 |
PEINH |
Number of units of measure to which the price refers |
dec |
7 |
PREIS |
Price for external processing |
curr |
13 |
PRZNT |
Value indicating the percent of work to be used for the operation |
int1 |
3 |
RASCH |
Key defining who and how a work center or machine is to be set up |
char |
2 |
RFGRP |
Classification combining setup group keys into setup group categories |
char |
10 |
RFSCH |
Indicates operations with the same or similar setup conditions |
char |
10 |
RMNGA |
Quantity that must be reworked due to faulty processing or lacking quality |
quan |
14 |
RSTZE |
Unit for setup time |
unit |
3 |
RUEST |
Setup time |
fltp |
|
SPLIM |
Number of partial lots in which a lot is divided or the number of individual capacities processing an operation in parallel |
dec |
5 |
SPMUS |
Indicates that the operation must be split |
char |
1 |
SSAVD |
Latest scheduled start of execution (date) |
dats |
8 |
SSAVZ |
Latest scheduled start of execution (time) |
tims |
6 |
SSEDD |
Latest scheduled finish of execution (date) |
dats |
8 |
SSEDZ |
Latest scheduled finish of execution (time) |
tims |
6 |
SSELD |
Latest scheduled finish of wait (date) |
dats |
8 |
SSELZ |
Latest scheduled finish of wait (time) |
tims |
6 |
SSEVD |
Latest finish of the operation (date) |
dats |
8 |
SSEVZ |
Latest finish of the operation (time) |
tims |
6 |
SSSAD |
Latest scheduled start of teardown (date) |
dats |
8 |
SSSAZ |
Latest scheduled start of teardown (time) |
tims |
6 |
SSSBD |
Latest scheduled start of processing (date) |
dast |
8 |
SSSBZ |
Latest scheduled start of processing (time) |
tims |
6 |
SSSLD |
Latest scheduled start of wait (date) |
dats |
8 |
SSSLZ |
Latest scheduled start of wait (time) |
tims |
6 |
STEUS |
Key specifying how an operation or sub-operation is to be processed |
char |
4 |
TRANZ |
Move time used in scheduling |
fltp |
22 |
TRAZE |
Unit for move time |
unit |
3 |
UEKAN |
Indicator specifying that the operation can overlap with the next operation, if necessary, such as during reduction of the execution time |
char |
1 |
UEMUS |
Indicator specifying that overlapping is required |
char |
1 |
USR04 |
User-defined field for quantity (length 10, 3) |
quan |
15 |
USR05 |
User-defined field for quantity (length 10, 3) |
quan |
15 |
USE04 |
User-defined field for the unit of quantity fields |
unit |
3 |
USE05 |
User-defined field for the unit of quantity fields |
unit |
3 |
VGE01-VGE06 |
Unit of measure of the standard value |
unit |
3 |
VGW01-VGW06 |
Standard value |
quan |
10 |
VGWTS |
Key defining a maximum of six standard values and a dimension |
char |
4 |
WARTZ |
Queue time used in scheduling |
fltp |
22 |
WRTZE |
Unit for queue time |
unit |
3 |
XDISP |
Indicates whether an operation or capacity requirements are dispatched |
char |
1 |
XMNGA |
Scrap confirmed for this operation |
quan |
14 |
ZEILP |
Unit for minimum wait time |
unit |
3 |
ZEIMB |
Unit for minimum processing time |
unit |
3 |
ZEIMU |
Unit for minimum overlap time |
unit |
3 |
ZEITN |
Unit for normal move time |
unit |
3 |
ZEIWM |
Unit for minimum queue time |
unit |
3 |
ZEIWN |
Unit for normal queue time |
unit |
3 |
ZLPRO |
Minimum wait time |
quan |
10 |
ZMINB |
Minimum processing time |
quan |
10 |
ZMINU |
Minimum overlap time |
quan |
10 |
ZTMIN |
Minimum move time |
quan |
10 |
ZWMIN |
Minimum queue time |
quan |
10 |
ZWNOR |
Normal queue time |
quan |
10 |
ISAVD |
Start of operation (date) |
dats |
8 |
IEAVD |
End of operation (date) |
dats |
8 |
ISDD |
Start of execution (date) |
dats |
8 |
ISDZ |
Start of setup (time) |
tims |
6 |
IEDD |
End of execution (date) |
dats |
8 |
IEDZ |
End of setup (time) |
tims |
8 |
ANZMA |
Number of employees |
E1KBEDL and E1KBEUL
Field |
Description |
Type |
Length |
BEDID |
Number of the capacity requirements record |
numc |
12 |
BEDZL |
Internal counter |
numc |
8 |
CANUM |
Counter of the capacity requirements record |
numc |
4 |
BEDKZ |
Indicates that capacity requirements correspond to the available capacity |
char |
1 |
KABRREST |
Remaining capacity requirements for the operation segment teardown |
fltp |
22 |
KABRSOLL |
Target capacity requirements for the operation segment teardown |
fltp |
22 |
KAPAR |
Capacity category |
char |
3 |
KAPID |
Number of the capacity |
numc |
8 |
KBEAREST |
Remaining capacity requirements for the operation segment processing |
fltp |
22 |
KBEASOLL |
Target capacity requirements for the operation segment processing |
fltp |
22 |
KEINH |
Unit for capacity requirements |
unit |
3 |
KRUEREST |
Remaining capacity requirements for the operation segment setup |
fltp |
22 |
KRUESOLL |
Target capacity requirements for the operation segment setup |
fltp |
22 |
E1RESBL002
Field |
Description |
Type |
Length |
AUSCH |
Component scrap in percent |
dec |
7 |
AVOAU |
Operation scrap |
dec |
7 |
BDART |
Specifies how the system carries out material requirements planning |
char |
2 |
BDMNG |
Requirements quantity |
quan |
14 |
BDTER |
Date when the specified quantiy of the material is required |
dats |
8 |
BEIKZ |
Key specifying the item as a part to be provided |
char |
1 |
CHARG |
Batch number |
char |
10 |
DBSKZ |
Indicates that the material is directly procured |
char |
1 |
ENMNG |
Quantity already withdrawn |
quan |
14 |
FMENG |
Indicator specifying that the quantity of an item is constant |
char |
1 |
KZKUP |
Indicates that this item is a co-product |
char |
1 |
LGORT |
Number of the storage location within a plant where the material is stored |
char |
4 |
MATNR |
Material number |
char |
18 |
MEINS |
Unit of measure in which the material stocks are managed |
unit |
3 |
NETAU |
Indicator specifying that the operation scrap of a component is calculated on the basis of the net required quantity from the material master record of the assembly |
char |
1 |
SBTER |
Latest requirements date |
dats |
8 |
SCHGT |
Indicates that this item is a loose material available directly at the work center (bulk material) |
char |
1 |
SOBKZ |
Indicates the type of special stock |
char |
1 |
UPSKZ |
Indicates that sub-items exist for this bill of material item |
char |
1 |
VERTI |
Distribution key for requirements planning |
char |
4 |
VMENG |
Confirmed for the availability check |
quan |
16 |
WERKS |
Key uniquely identifying a plant |
char |
4 |
BWART |
Movement type (inventory mgmt.) |
char |
3 |
SHKZG |
Debit/credit indicator |
char |
1 |
POSNR |
Position of BOM |
E1AFABL
Field |
Description |
Type |
Length |
AOBAR |
Type of relationship |
char |
2 |
AUFNR_VOR |
Order number of predecessor |
char |
12 |
VORNR_VOR |
Activity number of predecessor |
char |
4 |
AUFNR_VOR |
Order number of successor |
char |
12 |
VORNR_NCH |
Activity number of successor |
char |
4 |
ARBID (CRHD) |
Number of the work center |
numc |
8 |
DAUER |
Time interval of relationship |
quan |
7 |
DAUTM |
Duration of the relationship in scheduling in seconds |
int4 |
9 |
KALID |
Number of the factory calendar |
char |
2 |
PROVG |
Key specifying how the system determines the time interval for the relationship |
char |
1 |
PRZNT |
Percentage to be used to calculate the time interval of the relationship |
numc |
3 |
ZEINH |
Unit for the time interval of the relationship |
unit |
3 |
DAUERMAX |
Maximum time interval |
quant |
5 |
E1JSTKL and E1JSTVL
Field |
Description |
Type |
Length |
STAT |
Key indicating information about the current status of an object |
char |
5 |
STSMA |
Key indicating a status profile |
char |
8 |