LOIPLO01 

 

 

E1PLAFL

Field

Description

Type

Length

ABMNG

Reduced quantity in the planned order

quan

14

AUFFX

Indicates whether the planned order is fixed

char

1

AUFNR

Run schedule header number

char

12

AVMNG

Planned quantity to result in scrap during production of the entire planned order quantity

quan

14

BESKZ

Procurement type

char

1

DISPO

Number of the MRP controller or MRP controller group responsible for requirements planning, for example

char

3

EKORG

Purchasing organization

char

4

GSBTR

Overall confirmation date of the planned order after the ATP check

dats

8

GLTRS

Scheduled finish

dats

8

GSMNG

Total planned order quantity

quan

14

GSTRS

Scheduled start

dats

8

GSUZS

Earliest scheduled start of execution (time)

tims

6

KAPFX

Indicator specifying that the planned order capacity is dispatched

char

1

KDAUF

Sales order number

char

10

KDPOS

Item number in the sales order

char

6

LGORT

Number of the storage location within a plant where the material is stored

char

4

MATNR

Number of the material valid for the planned order

char

18

MDACC

Key for an action for which the planned order is carried out

char

4

MDACD

Action date for the planned order

dats

8

MDACH

Key specifying the sequence of "actions in the planned order"

char

2

MDACT

Action time for the planned order

tims

6

MDPBV

Confirmation of availability in the planned order

char

1

MEINS

Unit of measure in which a material’s stocks are managed

unit

3

PAART

Controls the order type to which the planned order is assigned

char

4

PALTR

Date used to determine the valid bill of material or routing for the planned order

dats

8

PEDTR

Basic finish date in the planned order

dats

8

PERTR

Planned creation date in the planned order

dats

8

PLNAL

This key together with the group uniquely identifies a task list

char

2

PLNNR

Key of the task list group

char

8

PLNTY

Task list type

char

1

PLNUM

Number of the planned order

char

10

PLWRK

Number of the planning plant

char

4

PSPEL

Internal project item number

numc

24

PSTTR

Basic start date in the planned order

dats

8

PWWRK

Production plant in the planned order

char

4

SEQNR

Sequence number in the order

numc

14

SERNR

The serial number indicates the production series

char

8

SOBES

Special procurement type

char

1

SOBKZ

Indicates the type of special stock

char

1

STLFX

Indicates whether the corresponding bill of material is fixed, which means it is not exploded again during a new planning run

char

1

UMSKZ

Indicator specifying whether the planned order can be converted to a production order or purchase requisition

char

1

VERID

Key specifying the various production techniques that can be used to produce a material

char

4

VFMNG

Confirmed quantity of the planned order

quan

14

WEBAZ

Number of workdays required for checking and storage after goods are received

dec

5

E1PLOPL 01 and E1PLUVL 01

Field

Description

Type

Length

VORNR

Operation number

char

4

UVORN

Sub-operation number

char

4

ARBEH

Unit of work

unit

3

ARBEI

Work completed when carrying out the operation

quan

8

ARBID

Number of the work center

numc

8

DAUNE

Time unit for the normal duration of the operation

unit

3

DAUNO

Normal operation duration

quan

6

FSEDD

Earliest scheduled finish of execution (date)

dats

8

FSEDZ

Earliest scheduled finish of execution (time)

tims

6

FSAVD

Earliest scheduled start of execution (date)

dats

8

FSAVZ

Earliest scheduled start of execution (time)

tims

6

FSSAD

Earliest scheduled start of teardown (date)

dats

8

FSSAZ

Earliest scheduled start of teardown (time)

tims

6

FSSBD

Earliest scheduled start of processing (date)

dats

8

FSSBZ

Earliest scheduled start of processing (time)

tims

6

PLNFL

Sequence of operations within a task list

char

6

SSEDD

Latest scheduled finish of execution (date)

dats

8

SSEDZ

Latest scheduled finish of execution (time)

tims

6

SSAVD

Latest scheduled start of execution (date)

dats

8

SSVAZ

Latest scheduled start of execution (time)

tims

6

SSSAD

Latest scheduled start of teardown (date)

dats

8

SSSAZ

Latest scheduled start of teardown (time)

tims

6

SSSBD

Latest scheduled start of processing (date)

dats

8

SSSBZ

Latest scheduled start of processing (time)

tims

6

USR04

User-defined field for quantity (10, 3)

quan

15

USR05

User-defined field for quantity (10, 3)

quan

15

USE04

User-defined field for the unit of quantity fields

unit

3

USE05

User-defined field for the unit of quantity fields

unit

3

VGE01-VGE06

Unit of measure for the standard value

unit

3

VGW01-VGW06

Standard value

quan

10

XDISP

Indicator specifying whether if an operation or capacity requirements have to be dispatched

char

1

ANZMA

Number of employees

   

You can find a description of tables E1KBEDL and E1RESBL in the IDoc LOIPRO01.