Reassigning Document Links 
Use
A document link can be assigned to
an order
header (no entries in
the
Sequence or Operation fields) or to an operation. You change this assignment using this procedure.
Procedure
Choose Logistics
®
Production
®
Shop floor control
®
Order
®
Change.Enter the order number.
Choose
.
The document overview appears.
Select the document links that are to be reassigned.
Choose
.
You have the following options:
- Select Header to assign the documents to the header.
- Select Operation to assign the documents to an operation, and enter the operation and sequence numbers.
- Choose
.
- Choose
.