Comparing MRP List and Stock/Requirements List 

Use

The MRP list displays the result of the last planning run. Changes that have occurred between planning runs are ignored in the MRP list.

In contrast to this, the system displays all changes in stock, receipts and issues, which have currently occurred, in the stock/requirements list.

By using the MRP list and stock/requirements list comparison you can compare these two evaluations with each other. This means that you can compare the situation at the time of the last planning run with the current stock/requirements situation.

Prerequisites

You have accessed the MRP list or the stock/requirements list.

Procedure

Result

You now branch into the comparison screen for both lists.

The system displays the date of the last planning run in the Comparison screen area.

In the Period totals screen area, the system shows the planning result in the period totals display. There are two of each column, that is, one for each list type. They can be told apart optically.

By choosing Stock/requirements list, you branch into the period totals display of the stock/requirements list and by choosing MRP list, you branch into the MRP list.

By double-clicking on a period, you call up the individual line display for the selected period in the lower part of the screen. The system lists all the MRP elements for this period individually.