Define
production scheduling profile
In this step you can create production
scheduling profiles for specific plants.
In a production scheduling profile, you
can
- specify that in a production order or process
order particular business transactions are carried out in parallel
- order release on order creation
- generation of document link from material
master on order creation
- generation of document link from BOM on order
creation
- printing on order release
- scheduling on order release
- generation of document link from material
master on order release
- generation of document link from BOM on order
release
- specify that only partial quantities are to be
confirmed in an availability check
- specify that automatic goods receipt should
take place
- enter an overall profile for capacity
leveling
- specify how the capacity requirements of
operations should go into the basic load
- specify when finite scheduling is carried out
in the capacity availability check
- specify that for the confirmation
- no deficit quantities are updated
- no surplus quantities are updated
- neither deficit nor surplus quantities are
updated
- an adjustment of the operation and component
quantities to the actual values takes place
- make various specifications in the area of
batch management:
- automatic batch creation on order
creation
- branch to batch classification on changing a
batch
- extended batch classification via Customer
Function Call
- specify that only transport requirements are
created if transport requirements can be generated for all components in the
operation
- specify that when transport requirements are
generated either the committed quantity or the required quantity are taken
into account
- specify that the creation of transport
requirements takes place automatically
- specify which order type is proposed depending
on the business process (make-to-stock, make-to-order, engineer-to-order,
order without material)
You can assign a production scheduling profile
to a
- material (work scheduling screen in material
master)
- production scheduler (Customizing)
The assignment to the material has a higher
priority.
The production scheduling profile is copied to
the production order or process order on order creation.
Activities
1. Create the
necessary production scheduling profiles.
2. Assign the
profiles to the appropriate materials or production schedulers.