Show TOC
Maintain
Versions
In this step you define the CO versions you
want to use for your operating concern. These versions are valid for all of CO
and for all operating concerns.
In Profitability Analysis, you can only use
versions for plan data . Consequently, the fields "Actual"
and "Exclusive use" are not relevant for CO-PA.
Each version has attributes which are only
valid for one operating concern.
The attributes determine the
following:
- whether you can plan a version
The
Version locked indicator lets you lock a plan version so that no
more changes can be made to it.
- which currency type should be used to store
the data in this version
If, alongside the
operating concern currency, the company code currency or the profit center
valuation are also active in your operating concern, you need to specify the
currency type for each version.
- which exchange rate should be used to
translate foreign currencies to the local currency
- for what date the system should derive
characteristics
In planning, the
system always tries to derive values for the characteristics which you do not
specify. Since these derivation rules are time-dependent, you can specify
which date the system should use when it performs derivation.
- which plan structure is checked for the plan
version
You can enter a plan
structure here to ensure that plan data for different profitability segments
corresponds to a pre-defined plan structure.
For the transfer of plan data to SOP, you can
determine:
- which characteristic group, if any, is
used
An interface in
planning lets you transfer planned sales quantities to Sales and Operations
Planning. You can specify for each plan version which characteristic group, if
any, should be provided to the user as an entry aid.
(See the example in the online documentation (F1).)
If you plan in weeks, you also need to
specify:
- which rule is used to distribute the weekly
plan values to plan periods
This rule determines
how the weekly values are distributed to periods when a week cannot be
assigned to one period.
(See the example in the online documentation (F1).)
- which calendar is used as a basis for this
distribution.
Actions
Define your CO version and select the
"Plan" indicator. Then maintain the operating
concern settings.