Prior to Release 4.6A, the settings for the material block for goods movements were not transported automatically. You had to maintain the changes manually in the target system.
As of Release 4.6A, the material block has an automatic transport link. All changes are recorded automatically in a change request.
When the late material block is activated, you can also specify a waiting time in which the system tries to lock the material master. If it does not manage to lock the material master data during this time, the posting of the goods movement is rejected due to a locking error.
You still make the settings for the material block in Customizing for Materials Management under
General Settings ->
Set Material Block.