Show TOC

Separation of Calculation of Value from the Goods Movement

Scope of Functions

Prior to Release 4.6A, every time you posted a goods movement, the system updated the value and the quantity immediately. When posting a lot of goods movements, this put the system under a lot of strain and resulted in less data throughput.

As of Release 4.6A, you can activate subsequent calculation of value. In this process, the system first updates the stocks of the materials that have been posted. It does not calculate the value at the same time, but in a second, separate step, which creates documents in Financial Accounting.

This procedure means that the system has less of a load when posting many goods movements. You can then start subsequent calculation of value at a later point in time when the system has more capacity.

By updating the value and the quantity separately, you achieve an increased data throughput when posting goods movements. Only a material block is set during posting; the value block is set later when the value is calculated.

For more information, particularly on prerequisites and constraints, refer to the program on the calculation of value RM07MWBU.