Show TOC

Assign Wage Types to Compensation Models

In this step, you specify the wage types that are to be included in or excluded from the total value of your compensation models . Each wage type can be given a weighting within the set.

Example

The compensation model CH35 determines working hours as the total of planned hours (wage type MI01) excluding 25% of piecework time (wage type ML01).

Activities

1. Decide which wage types are to make up a compensation model.
2. Select the compensation model to which you want to assign wage types, as prompted.
3. Choose New entries.
4. Enter the appropriate wage types.
5. If the value of a wage type is to be included in the total value for the model, enter a + (plus) sign. If it is to be deducted from the total, enter a - (minus) sign.
6. If you want a wage type to be taken into account only partially, enter a weighting percentage.
Note that a weighting factor of 100% is displayed as 00.00%