Use
You use this procedure to change the data of individual routings.
If you want to change objects in several or all of you routings, you should use one of the following procedures:
Changing Work Centers (Mass Changes) Replacing PRTs (Mass Changes)Prerequisites
The following data already exists in the system:
(See R/3 Library LO Engineering Change Management, Maintaining Change Master Records)
See R/3 Library LO Engineering Change Management, Assigning a Revision Level to a Material)
Procedure
Note: In the following procedure the task list type Routing is referred to, primarily in menu paths. The same paths are also valid for the other task list types (reference operation sets, rate routings and reference rate routings). If you want to maintain such an object choose the <task list type> instead of Routing.
The screen that then appears depends on the group you entered.
If there |
you reach the |
is only one routing in the group |
operation overview for this routing |
are several routings in the group |
header overview |