Entering a Confirmation for a Time Event 

  1. Choose Logistics ® Production ® Shop floor control ® Confirmation ® Enter ® For operation ® Time event.
  2. Select the time event you want to confirm.
  3. Enter the operation you want to confirm:
  1. Choose .
  2. Enter the actual data for the time event.
  3. You can let the system suggest a yield to be confirmed (see Determining a Default for Yield).

  4. Save your confirmation.

When you are entering a confirmation, you can go to the goods movements overview (choose Goods movements) to check or change goods movements that are to be posted with the confirmation, if required. As soon as you save a confirmation, the goods movements are also posted. For more information, refer to Goods Movement Overview.