Entering Time Ticket Confirmations 

  1. Call up time ticket confirmation entry using the transaction code co11 (see Entering a Transaction Code)
  2. To create a Progress confirmation choose Logistics ® Production ® Shop floor control ® Confirmation ® Enter ® For operation ® Progress confirmation.

  3. Enter the operation you want to confirm:

Select the operation you want to confirm and choose .

  1. Depending on the data you want to confirm, you can branch from the initial screen to various tab pages.

® Quantity/activity

® Dates

® Personnel/additional data

® Quantity/forecast

  1. Choose partial confirmation, final confirmation or automatic confirmation.

A partial confirmation can be especially useful if the operations in your orders have long lead times.

  1. Enter the data you want to confirm.

In time ticket confirmations, you enter the quantity that you have processed since the last confirmation for the operation. You can let the system suggest a yield to be confirmed (see Determining a Default for Yield).

If not all fields that you need for confirmation are available on the screen, you can reach the required fields or the required screens via the function keys or via the menu.

  1. Save your confirmation.

When you are entering a confirmation, you can go to the goods movements overview (choose Goods movements) to check or change goods movements that are to be posted with the confirmation, if required. As soon as you save a confirmation, the goods movements are also posted. For more information, refer to Goods Movement Overview.