Changing Parallel Sequences 

If you want to change the text for the sequence, the branch operation or the return operation , proceed as follows:

  1. Choose Goto ® Overviews ® Sequences.
  2. The system lists all the alternative and parallel sequences that already exist in the production order.

  3. Select the parallel sequence that you want to change and choose .

The system branches to a screen where you can make the changes.

If you want to change the operations in a sequence proceed as follows:

  1. Choose Goto ® Overviews ® Sequences.
  2. The system lists all the alternative and parallel sequences that already exist in the production order.

  3. Select the parallel sequence that you want to change and choose .

The system lists all the operations contained in the sequence.

For more information about maintaining operations refer to Changing Operation Data.