Production Orders (PP-SFC)
   Production Order Maintenance
      Creating a Production Order
      Changing a Production Order
      Production Order Creation
         Creating a Production Order with a Material
         Creating Production Orders Without a Material
         Creating a Production Order with a Sales Order
      Maintenance of Header Data in the Production Order
         Changing Header Data
      Maintenance of Operation Data
         Maintenance of the Operation Overview
         Maintaining an Individual Operation
         Cumulating Standard Values
      Planned Order Conversion
         Executing Individual Conversion of Planned Orders
         Executing Collective Conversion of Planned Orders
         Partial Conversion of Planned Orders
            Executing Partial Conversion of Planned Orders
      Order Comparison
      Simulation Order
   Copying Master Data
      Routing Selection
         Settings for Routing Selection
         Automatically Selecting a Routing
            Priorities for Automatic Routing Selection: Example
         Selecting a Routing Manually/Working without a Routing
         Sequences
            Exchanging Alternative Sequences
            Adding Parallel Sequences
            Changing Parallel Sequences
      Selecting Bills of Material
         Settings for Bill of Material Selection
         Selecting a Bill of Material Alternative
         Priorities for BOM Usage (Selection Priorities)
         BOM Explosion
            Determination of the Explosion Date
      Reading Master Data
         Reading Master Data
         Criteria for a Single Order
         Criteria in the Collective Order
   Document Integration in the Production Order
      Settings for Document Integration
      Automatic Generation of Document Links
      Manual Generation of Document Links
         Generating a Document Link from Master Data
         Creating a Document Link
      Document Link Maintenance
         Changing Document Links
         Reassigning Document Links
         Deleting Document Links
         Displaying Document Info Records
         Displaying Original Files
      Integrated Viewer for Displaying Original Application Files
   Scheduling
      Settings for Scheduling
         Scheduling Types
         Scheduling Parameters
         Control Key for Operations
      Scheduling Individual Orders
         Date Determination at Order Level
            Date Determination when an Order is Created
            Example: Calculation of Order Dates
         Date Determination at Operation Level
            Determination of the Operating Time
            Duration of the Operation Segments
            Example: Determining the Operation Dates
            Simultaneous Teardown and Wait
            Queue Time (Earliest and Latest Dates)
            Splitting
            Overlapping and Process Flow Production
            Parallel Sequences
            Suboperation Dates
            Scheduling Partially Confirmed Operations
            Lead Time Scheduling with Takts
         Reduction Measures
         Starting Scheduling
         Displaying Scheduling Settings and Scheduling Results
      Scheduling Collective Orders
         Linking Dates in Collective Orders
         Overlapping in Collective Orders
         Reduction via the Critical Path
      Scheduling of Requirements Dates
      Capacity Requirements
         Assigning Capacity Requirements
   Dispatching and Deallocating Without the Planning Board
   Components
      Data from Bills of Material
      Data from the Routing
      Data from the Material Master Record
      Manually Creating or Changing Components
      Changing Component Data
      Assignment of Components
         Creating Components
         Reassigning Components
         Sorting in the Component Overview
         Filtering in the Component Overview
         Deleting Components
      Backflushing with Stock Shortage
      Alternative Items
      Discontinuation Data
      Batch Determination
         Executing Batch Determination
         Batch Splits
         Splitting Batches
         Batch Splits: Requirement Quantities
      Batch Key
   Production Resources and Tools (PRTs)
      Creating Production Resources/Tools as Material
      Creating Production Resources/Tools as Equipment
      Creating Production Resources/Tools as a Document
      Creating Prod. Resources/Tools with a PRT Master Record (Misc.)
      Classifying Production Resources/Tools
      Linking a Document to a Production Resource/Tool
      Releasing/Locking Production Resources/Tools
      Maintenance Planning for Production Resources/Tools
         Creating PRT Usage Counters
         Creating Measurement Documents for PRT Usage Counters
         Assigning PRT Usage Counters to Prod. Resources/Tools
         Assigning Preventive Maintenance Plans to Prod. Resources/Tools
      Deletion of Production Resources/Tools
         Deleting Production Resources/Tools with a PRT Master Record
         Production Resources/Tools: Setting/Canceling a Deletion Flag
      Assignment of Production Resources/Tools to Operations
         Assigning Production Resources/Tools to Operations
         Production Resources/Tools: Deleting Assignments to Operations
      Assignment of Test Equipment to Inspection Characteristics
         Assigning Test Equipment to Inspection Characteristics
   Trigger points
      Standard Trigger Points
      Trigger Point Groups
      Example: Triggering a Function when Status Changes
      Example: Manually Triggering Functions During Confirmation
      Example: Linking a User Status to a Reason for Variance
      Creating Trigger Points
      Trigger Points: Usage
      Example: Using the Release Stop Indicator
   Availability Check
      Checking the Availability of Material
         Checking Group
         Checking Rule
         Checking Scope
         Checking Control
      How is the Availability Determined?
      At What Level is the Availability Checked?
      When is the Availability Checked?
      Carrying out an Availability Check
      Resetting Checking Result
      Collective Availability Check
         Collective Availability Check: Criteria
         Collective Availability Check: Results
         Executing a Collective Availability Check
      Checking Availability of PRTs
         Execute Availability Check for PRTs
      Checking the Availability of Capacities
   Preliminary Costing
      Cost Elements
      Material Costs
         Planned Costs for Components
         Planned Costs for Material Manufactured In-house
         Planned Costs for Material Procured Externally
      Production Costs
         Planned Costs for Production
         Planned Costs for Internal Activity
      Setting up a Quantity Structure
      Planned Costs for External Processing
      Overhead Costs
      Overhead Groups
      Displaying Costs
   Order Release
      Release at Order Header Level
         Manual Release of Orders
         Automatic Release
         Collective Release
            Executing Collective Release
      Release of Operations
         Releasing an operation
   Material Serial Numbers in Production Orders
   As-Built Configuration
      Creation of As-Built Configurations
         Creating/Changing an As-Built Configuration Using the List Input
         Creating/Changing As-Built Configurations Using Node Assignment
   Inspection Lots
      Creating Inspection Lots
      Deleting Inspection Lots
      Creating Inspection Characteristics
      Deleting Operations with Inspection Characteristics
      Inspection Lots: Restrictions
   Missing Parts
      Calling Up a Missing Parts List
      Backorder Processing
         Mail Link
         Checking Rule
         Calling Up Backorder Processing
         Processing Dependent Reservations
         Processing Sales Orders
   Printing
      List Types
      Printing: Parameters in Customizing
      Printing: Prerequisites
         Lists of Operations
         Lists for Components
         Lists for Production Resources and Tools
      Printing Types
      Printing from a Production Order
      Printing Production Orders
      Automatic Printing on Order Release
      Printing a Component/Operation List
   External Procurement/Processing
      External Processing of Operations
      External Procurement of Components
      Goods Receipt
      Changes in the Order
      Provision of Components
      Scheduling an External Operation
      Costs of External Processing/Procurement
   Goods Movements
      Withdrawing Material Components
      Goods Movement Overview
         Splitting goods movements
         Executing Batch Determination
         Executing Stock Determination
      Picking
         Picking - Execution
      Stock Determination
      Material staging
      Executing Unplanned Withdrawal of Components for an Order
      Automatic Creation of Batches
      Delivering to the Warehouse
      Automatic Goods Receipt
      What Checks are Carried out During a Goods Receipt?
      Effects of a Delivery to Stock
         Delivery to Stock: Costs
         Delivery to Stock: Updates in the Material Master
         Delivery to Stock: Updates in the Order
      Performing a Goods Receipt
   Confirmations
      Confirmation: Fixed Parameters
      Confirmation: Variable Parameters
      Entering Confirmations
         Entering Time Ticket Confirmations
         Executing Single Screen Entry of Time Ticket Confirmations
            Settings for Single Screen Entry
         Entering Collective Confirmations
         Executing Fast entry for Time Tickets
         Entering a Confirmation for a Time Event
            Time Event Confirmations
         Entering Confirmations at Order Level
         Confirming Individual Capacities
         Determining a Default for Yield
         Milestone Confirmation
         Progress confirmation
            Entering Progress Confirmations
            Progress Confirmations and Operations with Final Confirmations
         Summary Confirmations
            Creating Summary Confirmations
         Standard confirmation
            Entering Standard Confirmations
      Goods Movements for Confirmation
      Determining Quantities for Batch Splits/Parts to be Discontinued
      Displaying Requested Confirmations
      Displaying Confirmations
      Canceling Confirmations
         Canceling Confirmations
         Example: Canceling confirmations
      Reprocessing
         Reprocessing Confirmations
            Reprocessing Confirmations
         Cost Determination Error Processing
            Starting a New Costing Run
         Failed Goods Movements Processing
            Reprocessing Goods Movements
      Decoupling Processes Carried out During Confirmation
         Settings for Decoupling Confirmation Processes
         Example: Background Processing
         Processing Predefined Confirmation Processes
      PDC Data Transfer via Communication Channel 2 (CC2)
         Download
         Upload
         Application Logic of the PDC Data Transfer in CC2
      PP-PDC Interface
   Rework
      Rework Operations and Rework Quantities
      Rework and Confirmation
   Order Settlement
      Requirements for Settlement
         Settlement Profile
         Settlement Structure
         Settlement Rule
         Settlement: Standard Settings
      Calling Up a Settlement Rule
      Changing a Settlement Rule
      Deleting a Distribution Rule
      Creating Distribution Rules
      Percent Validation
      Delivery to Stock
      Settling an Order
      Result of Settlement
      Connections Between Delivery and Settlement
      Settlement in the Case of Stock Shortage
         Example: Settlement in the Case of Stock Shortage
      Settling Scrap
         Example: Settling Scrap
   Technical Completion of a Production Order
   Closing a Production Order
   Archiving Production Orders
   Order Change Management (OCM)
      Change Process
      Creation of Initiating Object Records
         Change Profile
      Processing Initiating Object Records
         Searching for Procurement Elements
      Changing Production Orders
         Executing Process Steps
         Creation of a Simulation Order
         Determination of the Changes
            Executing a Comparison
         Checking Changes
            Processing Change Steps
         Execution of the Changes
         Execution with Marked Objects
            Confirming or Rejecting Change Actions
         Overview of the Change Steps
         Change Management in the Production Order
      Assembly Orders in Order Change Management
         Completing a Change Comparison
   Mass Processing of Production Orders
      Mass Processing Functions
      Displaying the Application Toolbar with Mass Proc. Functions
      Logs
      Executing Mass Processing Online
      Scheduling Mass Processing in the Background
      Definition of Variants
      Processing Requests
      Example: Using Mass Processing
      Setting Up Parallel Processing
   Status
      System/User Status
         Displaying a Status
      What is a Business Transaction?
      What is a Status Profile?
      What is a Selection Profile?
      Creating User Statuses
      Activating User Statuses
      Status Change Documents
         Maintaining Default Settings
         Displaying Status Change Documents
   Co-Products
      Co-Products: Prerequisites
      Co-Products: Costs
      Co-Products: Source Structures
   Collective orders
      Creation of Collective Orders
      Maintaining Collective Orders
      Costs in Collective Orders
      Release of Collective Orders
         Example: Releasing Orders and Operations in Collective Orders
      Confirmations in Collective Orders
         Example: Confirming Collective Orders
      Posting Sub-Assemblies to Stock in a Collective Order
   Order Information System
      Individual Object Lists
         Calling Individual Object Lists
         Profiles
         Layouts
      Object Overview
         Calling Up the Object Overview
         Overall profiles
         Selecting and Deselecting Database Objects
   Order Progress Report
      Settings for Order Progress Reports
      Progress Value Determination and Display of Exception Messages
      Functions in the Order Progress Report
         Calling the Order Progress Report
   Assembly Orders
   Order Split
      Prerequisites
      Examples for Order Split
      Executing Order Split
      Serial Number Assignment During Order Split
   Operations/Components Not Relevant to MRP
      Activate Purchase Requisition/Reservation
   Product Cost Collector