Creating a General Cost Object 
The screen Create Cost Object: Initial Screen appears.

The key of a general cost object is unique within a client. If you are working with distributed systems, make sure that the key is unique in all systems.
The screen Create Cost Object: Basic Screen appears.
The object currency is determined through the company code.
-
Costing sheet-
Overhead key (if applicable)
If you are using costing sheet PP-PC1 (supplied with the standard system), no overhead key is transferred because there is no overhead key in this costing sheet.
Check the proposed control parameters for the calculation of overhead.