Creating a Production Process for a Cost Object Hierarchy 
Prerequisites
cost object hierarchy for the Controlling level Material / Plant /
Production Process.
A production process may already have been created for one of the following reasons:
product cost collector for the material.
Procedure
The screen Display Production Processes appears.
The screen Assign Controlling Level for Material appears.
The screen Create Production Process appears.
Result
The system has created a production process for the material.
The production process was created in accordance with the Controlling level you selected. This Controlling level is valid for this plant material and can be changed under certain conditions. See also:
Editing the Controlling LevelThe production process is updated in all product cost collectors and
manufacturing orders for this production process. All product cost collectors and manufacturing orders for this production process are automatically assigned to the relevant cost object node.