Routings (PP-BD-RTG)
   Business Object - Routing (Generic)
   Routing Structure and Navigation
   Maintaining Routings and Rate Routings
      Routing
      Rate Routing
      First Steps in Routing Maintenance
         Group
         Creating a Routing
         Creating a Routing by Copying
            Creating Routings by Copying
         Routing Creation (Using the Results from Configuration Simulatio
         Routing Creation via Batch Input
            Creating Routings Using Batch Input
         Changing Routings
      Editing Header Data
         Maintaining the Header
         Material Assignment for Routings
            Assigning Material to a Routing
         Editing Production Versions
         Editing QM Data in the Header
            Maintaining QM Data in the Header
         Creating a Long Text for Routing
         Routing Classification
            Classifying Routings
      Editing Sequences
         Sequence
            Standard Sequence
            Parallel Sequence
            Alternative Sequence
         Maintaining the Standard Sequence
         Creating a Parallel Sequence
            Creating a Parallel Sequence
         Creating an Alternative Sequence
            Creating an Alternative Sequence
         Alignment key
      Editing Operations and Sub-operations
         Operation
         Sub-Operations
         Control Key
         Editing External Processing Data
            Providing Components
            Additionally Assigning Components Without Providing them
         Standard Value Editing
            Cumulating Standard Values
         CAPP Standard Value Calculation
         Editing User-Defined Fields
         Maintaining Operations/Sub-Operations
         Deleting an Operation/Sub-Operation
         Searching for an Operation/Sub-Operation
         Maintaining Detail Screens for Operations / Sub-operations
         Creating a Long Text for an Operation/Sub-Operation
         Omitting Sub-Operations in the Production Order
      Maintaining Material Components
         Backflushing
         Assigning Material Components to Operations/sub-Operations
         Reassigning Material Components
         Deleting Component Assignments
         Sorting Material Components
         Filtering Material Components
         Displaying Administrative Data for a Component Assignment
         Consistency Check for Material Assignment
            Checking the Consistency of Material Assignments
      QM Data Maintenance
         Inspection Points
         Dynamic Modification
         Editing QM Data in the Header
            Maintaining QM Data in the Header
         Maintaining QM Data in the Operation
         Inspection Characteristics
            Maintaining Insp. Characteristics for Operations
            Deleting Inspection Characteristics
      Production Resources/Tools
         Creating a Production Resource/Tool as a Material
         Creating a Production Resource/Tool as a Piece of Equipment
         Creating Production Resources/Tools as a Document
         Creating a PRT with a PRT Master Record (Miscellaneous)
         Classifying Production Resources/Tools
         Linking a Document to a Production Resource/Tool
         Releasing/Locking Production Resources/ Tools
         Maintenance Planning for Production Resources/Tools
         Creating a PRT Wear Counter
         Creating Measurement Documents for PRT Wear Counters
         Assigning PRT wear counters to Production Resources/
         Assigning Maintenance Plans to Production Resources/Tools
         Deletion of Production Resources/Tools
            Deleting Production Resources/Tools with a PRT Master
            Production Resources/Tools: Setting/Canceling a Deletion Flag
         Assignment of Production Resources/Tools to Operations
            Assigning Production Resources/Tools to Operations
            Production Resources/Tools: Deleting an Assignment to an Operati
            Assignment of Test Equipment to Inspection Characteristics
            Assigning Test Equipment to Inspection Characteristics
      Trigger points
         Creating a Standard Trigger Point
         Creating a Trigger Point
         Creating a Trigger Point by Copying
      Scheduling Routings
         Scheduling Types
         Basic Dates
         Floats Before and After Production
         Operation Segments
         Duration of Individual Operation Segments
         Queue Time
         Formulas for Calculating Setup, Processing and Teardown
         Move Time
         Operating Time
         Sub-Operation Dates
         Alignment Key in Parallel Sequences
         Reduction Measures
         Reduction Strategy
         Reduction in Operation
         Reduction in Routings with Parallel Sequences via the Critical P
         Reduction of Floats Before and After Production
         Splitting
         Overlapping
            Example: Overlapping Using Flow Manufacturing
         Transferring Scheduling Results to a Material Master Record
         Sources of Error: What to do if... ?
         Example: Calculating Operation Dates
         Scheduling a Routing
         Scheduling Results
         Gantt Chart
         Scheduling Log
         Updating Material Master Records
            Copying Data to the Temporary File Manually
            Updating Material Master Records Manually
            Copying Data to the Temporary File Automatically
               Copying Data to the Temporary File Automatically
            Automatic Update of Material Master Records
               Updating the Material Master Record Automatically
      Consistency Check
         Activating the Automatic Consistency Check
         Checking a Routing
      Printing a Routing
         Printing a Routing
   Maintaining Reference Operation Sets and Reference Rate Routings
      Reference Operation Set
      Reference Rate Routing
      Reference to a Reference Operation Set/Reference Rate Routing
         Referencing Reference Operation Sets/Reference Rate Routings
      Unlocking Reference Operation Sets / Reference Rate Routings
         Unlocking Reference Operation Sets/Reference Rate Routings
      Replacing Reference Operation Sets / Reference Rate Routings
         Individually Replacing Reference Operation Sets/Reference Rate R
      Display of References
         Displaying Information About a Reference
   Change Management
      Working with Change Documents
         Evaluating and Printing Change Documents
      Change Statuses
      Working without History
         Working without History: Example
      Working with History
         Working with History: Example
         Evaluating and Printing Change Statuses
   Editing Configurable Routings
      Changing Values in a Routing
      Creating Local Object Dependencies for an Operation
      Creating Global Object Dependencies in an Operation
   Mass Changes and Where-Used Lists
      Displaying a Where-Used List for a Work Center
      Displaying a Where-Used List for a Reference Operation Set
      Displaying a Where-Used List for a Production Resource/Tool
      Displaying Usage in Deleted Task Lists
      Replacing Work Centers (Mass Replacement)
      Maintaining Default Values (Mass Replace)
      Default Values
      Displaying and Changing Data for Selected Routings
      Controlling Mass Replacement Processing
      Replacing Reference Operation Sets (Mass Replacement)
      Replacing PRTs (Mass Replacement)
      Displaying an Error Log
   Archiving and Deleting Routings
      Selection Criteria
      Dependencies
      Deletion/Archiving Criteria
      Routings with Several Change Statuses
      Before Archiving
      Routings from Older R/3 Releases
      Deletion without Archiving
      Displaying Administrative Data
      Deleting Routings without Archiving