Assigning Templates for Cost Objects and Calculations 
Use
Because templates for cost objects are dependent on materials and orders, the SAP System must select the appropriate template at the time of the valuation event. Template selection is based on the following assignment logic:
The SAP System selects the template based on the overhead structure, the distribution key, and the environment.
Procedure

The costing sheet must always be entered. Without a costing sheet, the template is not pulled and costs are not calculated.
Assigning Templates - Cost Objects


Only one template will be called up for each environment.