Unlocking Reference Operation Sets/Reference Rate Routings 

Procedure

  1. In the operation overview of the routing select an operation of the referenced reference operation set (or reference rate routing)
  2. Choose Extras ® Reference ® Unlock.

Result

The system copies the operations from the reference operation set (or reference rate routing) to the routing (or rate routing). You can now maintain them as normal operations.