Show TOC
Read Planned
Working Time from Work Schedule
In this IMG activity you set up function
P200 in
personnel calculation schema TC00. This function imports the
day's
planned working time and generates a
time pair based on the planned working time.
Example
The standard SAP system distinguishes
four
day
types:
You want time pairs to be formed according to
planned working time for day type 1 (usually public holidays), and delimited
with time data which has already been imported into table.
Standard
Settings
Import planned working times into table. You
form time pairs according to the planned working times. Core times specified
in the daily work schedule are not taken into account.
Activities
1. If you want
the system to create a planned pair each day irrespective of the day type,
enter EVER as the first parameter of function P2000
in personnel calculation schema TC00.
2. Specify how
the time pairs to be imported should be merged with the existing time pairs.
To do this, set the second parameter of function P2000 as
follows:
- blank: existing time
pairs remain unchanged
- xy: only time pairs
for which the pair type is listed
(in this case, x or y) are delimited by the pairs
to be imported
- *: Each existing
time pair which collides with an imported
time pair is delimited. This applies to all imported time
pairs.
3. Decide
whether or not the core time in the daily work schedule is relevant for
further processing. If not, enter N as the third
parameter in the function P2000.
4. If needed
enter NOTP as the fourth parameter. The time pairs
are not derived from the daily work schedule if this parameter is entered. You
can use this parameter if the actual times are to be taken directly from the
recorded attendances (infotype 2002).
Further
Notes
In time evaluation, the pair type of the time
pair indicates whether the employee is at work or absent. The pair types are
as follows:
The time pairs imported by this function are
assigned the pair type attendance pairs ("1") and the origin
indicator BLANK on a workday.