Use
To calculate the costs of getting your team ready for the job you create a planning form. Such costs depend on the planned consultant hours. To ensure you are adequately resourced, you specify that for more than 100 consultant hours external employees are to be used for the work. The additional costs incurred are also to be included in the cost estimate.
You assign characteristics to the planning form. You specify in the derivation rules (template):
Procedure
Menu path |
Via the project system: Logistics ® Project System ® Basic Data ® Templates ® Models for Easy Cost Planning.Via Product Cost Planning: Accounting ® Controlling ® Product Cost Controlling ® Product Cost Planning ® Easy Cost Planning & Execution Services ® Edit Ad Hoc Cost Estimate. |
Transaction code |
CKCM |
The screen Easy Cost Planning: Model appears. The left-hand side contains the Worklists. The right-hand side of the screen is the work area for planning form maintenance.
The dialog box Create Model appears.
Field |
Data |
Costing Model |
ZXXX (where XXX stands for any three figure number) |
Name |
XXX IT: team preparation |
The system displays the various steps in model maintenance in the work area. You choose the process step Assign characteristics to the model.
In the lower work area you will see the list for maintaining characteristics.
Assigning Characteristics
Field |
Data |
Characteristic Name |
PS_PERS_HOURS |
Because the characteristic has already been maintained, the system transfers the characteristic data.
Creating Characteristics
Field |
Data |
Characteristic Name |
Z_XXX_Zusatz |
Because the characteristic has not yet been maintained in the system, the characteristics maintenance screen appears.
Field |
Data |
Description |
Additional costs (Euro) |
Format: Data Type |
Numeric format |
No of Chars |
8 |
Decimal places |
2 |
You return to the screen Easy Cost Planning: Model.
Defining Derivation Rules
The dialog box Selection of Reference Object appears. Select the reference object All objects. The planning form can be used for projects, internal orders, investment measures and ad hoc cost estimates.
The Create Template screen appears.
Field |
Data |
Type |
Cost Center/Activity Type (use poss. entries) |
Name |
Internal Consulting Hours |
Object |
Using possible entries: Cost Center: 4120 Select by double-clicking on the entry in the results list for the year 2000 |
Quantity |
PS_PERS_HOURS |
Field |
Data |
Type |
Variable Item (use poss. entries) |
Name |
Additional Costs |
Object |
Using possible entries: Cost Element: 466000 |
Quantity |
1 |
Activation |
Active (use poss. entries) |
Price |
Z_XXX_ZUSATZ |
Field |
Data |
Type |
Costing Model (use poss. entries) |
Name |
IT: With External Consultants |
Object |
Using possible entries: Costing Model: ZPS004 |
The variable costs are included in the cost estimate in every case.
Setting Conditions
You access the method editor in which you specify the conditions for including an item in the cost estimate.
The Create Template Z_XXX. screen appears.
Field |
Data |
Comparison operand 1 |
PS_PERS_HOURS |
Comparison |
£ Less |
Comparison operand 2 |
100 |
Field |
Data |
Comparison operand 1 |
PS_PERS_HOURS |
Comparison |
> Greater |
Comparison operand 2 |
100 |