Multi-Level, Sales Order Planning 

Use

With multi-level, sales order planning you can plan a sales order item, for which the strategy Make-to-order production is entered in the material master, over several production levels.

Features

Activities

  1. Starting from the MRP node, choose Planning ® Single-item, sales order.
  2. The initial screen for sales order planning, multi-level appears.

  3. Enter the number of the sales order and the number of the sales order item.
  4. Enter the control parameters required, as described in Control Parameters for the Planning Run and Single-Item, Multi-Level Planning and start the planning run.

For further information on processing the result see Working with the Material List and Working with the Planning Result .