Releasing a Project Using a Basic Engineering Confirmation 
Use
All WBS elements, networks and activities as of the release milestone Down payment in the activity Basic Engineering Acceptance have the system status Open (EROF).
When you confirm the Basic Engineering Acceptance activity for the last time, milestone functions are triggered by the assigned milestone.
This leads to:
To simplify the process, you then release the entire project. After having released the project, you can then start to execute it. You cannot post actual costs and actual revenue to the individual WBS elements and activities until you have released the project.
You can find further information on confirmations in the Project System in the SAP Library under Logistics ®
Project System ® Confirmation.Prerequisites
A milestone has been maintained for the Basic Engineering network. This milestone has been assigned to the Acceptance Basic Engineering activity.
Procedure
Menu Path |
Choose from the Project node in the Project Builder. |
Transaction Code |
CJ20N |
Power plant
Engineering
Basic Engineering
Basic Engineering
A dialog box for entering confirmations for the network (actual data) appears.
Field |
Data |
Final confirmation |
Select |
A message appears informing you that the project will be released by the next release milestone
All the activities in the project receive the released status. The WBS elements receive a status dictating that they have been partially released.
The system status changes from open to released. You have released the project definition and all its subordinate WBS elements.