Checking the Stock/Requirements List 
Use
The stock/requirements list displays the currently valid requirements and stock situation for a specific material. You use this function to check stock at various times during your component processing.
If you have not opened another session, call a second session (also referred to as session two – stock/requirements list) by choosing
.
To evaluate the current data, you must update the report after changes have been made to material stock by choosing
. If you want to display the stock list for another material, enter the material and then choose
.
You can find further information in the SAP Library under Logistics ®
PP Production Planning and Control ® PP Material Requirements Planning.Procedure
Menu Path |
Logistics ® Project System ® Material ® Planning ® Stock/Requirements List |
Transaction Code |
MD04 |
Field |
Data |
Material |
IECPP-2-GE12 |
Plant |
4000 |