Entry of wait period (hours, minutes, seconds) the converter waits to start a conversion.
Because the wait period is already blocked in the work process for the batch job and the number of work processes for batchjobs is limited in your system, we recommend you keep the wait period as short as possible. These keeps keeps your batch job from blocking other batch jobs from important enterprise areas, such as controlling.
If you want to start the conversion 4 hours and 30 minutes later enter the following:
| Maximum wait period for conversion (hours): | 04:30:00 |
Before conversion starts the following steps are executed automatically:
If one of the required objects is not available all other objects are unlocked. A time is randomaly selected (abnormal time). The wait period is increased by each run and the steps are executed again.
Before a conversion begines the following steps are executed automatically:
After the wait period the system attempts again to lock any unlocked documents again.
The conversion attempts are repeated so long until one of the following situations occurs: