Scheduling 

Use

Scheduling is carried out in MRP after the system has calculated the quantity to be procured in the lot-size calculation. As the materials planned using consumption-based planing are externally procure, the following description is of scheduling for external procurement.

Scheduling determines the order start and the order finish dates of the procurement elements.

Prerequisites

Features

In forecast-based planning, the basic dates are calculated in backward scheduling, in reorder point planning, they are calculated in forward scheduling.

 

Process Flow

 

Result