Lot-Size Calculation 

Purpose

The lot-size calculation is carried out in MRP. In the net requirements calculation, the system determines material shortages for each requirement date. These shortage quanities must be covered by receipt elements. The system then calculates the quantities required for the receipts in the planning run in the procurement quantity calculation.

Prerequisites

Process Flow

  1. The system compares the shortage quantity calculated with the parameters of the lot-sizing procedure chosen and so calculates the lot size.
  2. If you have specified a rounding value or a rounding profile, the system rounds up the lot size and thus calculates the procurement quantity.

Result

The result of the lot-size calculation is the quantity to be produced or procured. You can display and change the procurement quantity in the procurement proposal.