Demand Management (PP-MP-DEM)
   Position of Demand Mgt in the Supply Chain
   Planning Strategies
      Strategies for Make-to-Stock Production
         Planning with Final Assembly (40)
            Sample Scenario: Strategy 40
            Coping w/ Insufficient Coverage of Components
         Production by Lot Size (30)
            Sample Scenario: Strategy 30
         Net Requirements Planning (10)
            Sample Scenario: Strategy 10
            Comparing Strategies 10 and 40
            Combining Strategies 10 and 30
         Gross Requirements Planning (11)
            Sample Scenario: Strategy 11
         Planning w/o Final Assembly and w/o MTO (52)
            Sample Scenario: Strategy 52
         Planning w/ a Planning Material and w/o MTO (63)
            Sample Scenario: Strategy 63
      Strategies for Planning Components
         Planning at Assembly Level (70)
            Sample Scenario: Strategy 70
         Planning at Phantom Assembly Level (59)
            Sample Scenario: Strategy 59
         Planning w/o Final Assembly at Assembly Level (74)
            Sample Scenario 74
         Stockkeeping at Different BOM Levels
         Replenishment Lead Time
      Strategies for Make-to-Order (MTO) Production
         Planning w/o Final Assembly (50)
            Sample Scenario: Strategy 50
         Planning with a Planning Material (60)
            Sample Scenario: Strategy 60
         Make-to-Order Production (20)
            Sample Scenario: Strategy 20
         Cross-Plant Planning
      Strategies for Configurable Materials
         Strategies for Variants
            MTO Production for Material Variants (26)
               Comparing Strategies 25 and 26
            Planning Variants w/o Final Assembly (55)
            Planning Variants w/ a Planning Material (65)
         Characteristics Planning
            Creating PIRs for Characteristics Planning
               Copying Data Per Column
               Copying Data Per Line
               Processing Configuration Supporting Points
               Integrating LIS
            Creating Planning Profiles for Char. Planning
               Flagging a Comb. Value Key for Planning
            Characteristics Planning w/ Dependent Req'ts (56)
               Sample Scenario: Strategy 56
            Assembly Processing w/ Char. Planning (89)
               Sample Scenario: Strategy 89
               Comparing Strategies 56 and 89
         Make-to-Order Production w/ Configuration (25)
      Strategies for Assembly Orders
         Assemble-to-order
            Assemble-to-order with Production Orders
            Assemble-to-order with Variant Configuration
            Assemble-to-order with Projects
            Assemble-to-order with Planned Orders
            Special Settings for Production Orders
            Special Settings for Planned Orders
            Special Settings for Projects
            Special Settings for Repetitive Manufacturing
            Special Setting for Variant Configuration
      Table of Planning Strategy Assignments
         Determination of the Requirements Type
      Determining and Assigning the Planning Strategy
      Consumption Strategies and Logic
      Cross-Plant Planning
      Availability Check
   Reuse of Infomation in Demand Management
      Use of References for Creating the Demand Program
      Copying a Forecast
      Copying the Total Forecast
      Copying a Forecast in Simulation Mode
      Copying the Original Plan
      Copying Versions (Collectively)
      Copying Data and Monitoring Reference Changes
      Copying Data Without Monitoring Reference Changes
      Copying Data and Monitoring Forecast Changes
      Copying Data Without Monitoring Forecast Changes
      Copying Schedule Lines Between Versions
      Copying Standard SOP Results for a Material
      Copying Standard SOP Results for a Product Group
      Copying Simulative Dependent Requirements
      Copying Reference Changes in Simulation Mode
      Copying Flexible Planning
      Copying PIRs
      Copying Usage Probabilities from LIS
      Determining Planning Quantities Using the Material
   Reorganization of Planning Data
      Maintaining Histories
      Changing Histories per Schedule Line
      Changing Histories per PIR Item
      Deleting the History
      Modification of Schedule Lines
         Postponing Dates in the Schedule Lines
         Reorganizing Schedule Lines
   Display of Information in Demand Management
      Version Management
         Comparing Versions
         Setting Periodicity for Versions
      Display of Schedule Lines
      Displaying Total Requirements
      Displaying Values
      EXCEL Interface to Demand Management
         Accessing the EXCEL Interface
   Planned Independent Requirements (PIRs)
      Changing PIRs
      Maintaining Requirements Parameters
      Adjusting Requirements
      Creating PIRs with Reference
      Creating PIRs Without Reference
      Automatic Req'ts Split when Copying References
      Creating PIRs for the MRP Area
      Splitting PIRs (Periodic Disaggregation)
         Splitting the Planned Quantity when Creating PIRs
         Splitting the Planned Quantity when Changing PIRs
         Staggering the Requirements Split
   Customer Requirements
      Availability Check for Customer Requirements
      Creating Customer Requirements
      Changing Customer Requirements