Calculating the Supplementary Key Figures for Information Structures S068, S069 and S104 

The following information shows you how to dynamically calculate the supplementary key figures of the vendor, customer and material analysis with a reference to inspection lot in the Quality Management Information System during runtime. The key figures originate from the information structures S068 (Vendor) and S069 (Material) and S104 (Customer).

Lead Time

The lead time of an inspection begins with the date on which the inspection lot was created and ends with the date on which the usage decision is made. The lead time is also the difference in factory calendar days between these two basic dates (inspection lot creation and the usage decision) while taking the time into account.

If the usage decision is made on the same day that the inspection lot is created (a skipped lot, for example), then the lead time is > 1.

In QMIS the average and standard deviation are calculated for the lead time (LT).

The average lead time is the quotient from the sum of the lead time and the number of inspection lots.

Average LT = S LT / Number of inspection lots

StdDev. LT = Ö ( S LT 2 - ( S LT) 2 /n ) / (n-1)

Share of Non-Conforming Units

The share of non-conforming units and the number of defects per 100 units are used in the sampling system for an inspection based on qualitative characteristics and for formulation of sampling plans as the quality level.

In QMIS the average and standard deviation are calculated for the share of non-conforming units in the inspection lot (SHR).

Average SHR = SHR / Number of inspection lots * 100

StdDev. SHR = Ö ( S SHR 2 - ( S SHR) 2 /n ) / (n-1) * 100

Quality Key Figures

The quality score is a relative or standardized statistical value that describes the valuation of the quality.

In QMIS the average and the standard deviation are calculated for the quality score (QSc).

Average QSC = S QSC / number of inspection lots

StdDev. QSc = Ö ( S QSc 2 - ( S QSc) 2 /n ) / (n-1)

Rates

In QMIS, a rate refers to a quantity-related or a number-related ratio expressed as a percent.

Rate of rejected lots =
(Lots not OK / Total lots) * 100

Rate of skipped lots =
(Lots skipped / total lots) * 100

Rate of rejected qty =
(Rejected qty / all lots qty) * 100

Rate of skipped qty =
(Skipped qty / all lots qty) * 100

Rate of sample qty =
(Smpl qty (trgt) / All lots qty) * 100