Use
You plan non-stock material if:
Procedure
- To display the material components for all order operations, call up the Component overview.
- To display the material components for a particular operation, select the required operation and then call up the Component overview.
If you are on the overview screen for the material components of all the order operations, and you have used more than one material component, you must also enter the operation for which each material is being planned. However, if there is only one operation in this order, the material is automatically assigned to this operation.
Choose Continue.
- Automatic Determination
On the overview screen for the material components, choose Order
® Functions ® Redefine delivery address.The system now determines the delivery address automatically according to the specifications which were maintained in the Customizing for Plant Maintenance for the access sequence when an address is proposed in the purchasing data.
A dialog box appears in which you enter whether or not delivery addresses, which have already been entered manually, should be overwritten.
If necessary, check the delivery address determined by selecting the required non-stock component and calling up the address dialog box using Component
® Delivery address.- Manual Entry
Select the required component and choose the Address tab page. A dialog box appears in which you can enter the delivery address.

If you need to enter the same delivery address for a number of non-stock components in one order, you can use the function Use previous in the dialog box. The system then automatically inserts the delivery address, which was specified for the previous non-stock material in the dialog box.
The system automatically writes the delivery address to the purchase requisition for the non-stock material. If the system cannot determine any address, and you have not entered one manually, it automatically uses the plant address.