Subsequently Entering Operations 

  1. Call up the maintenance task list in the create or change mode, and choose Goto ® Operation overview.
  2. Position the cursor where the new operation should be and use the menu bar sequence Edit ® Insert.
  3. The system displays a new entry line ready for input.

  4. Enter the necessary data.
  5. Enter detail data for the operation if necessary (see Entering Detail Data in the Operation).
  6. Save the maintenance task list.

If you insert an operation in a maintenance task list for planned maintenance which is already in operation the maintenance items that were already released at the time the task list was changed will not contain the new operation.