Variant Settings for the Initial Run (CS-AG/PM-PRM-MP) 

In the variant maintenance for the initial run, different criteria are available for selecting maintenance plans (for example, maintenance plan category, maintenance plan area, equipment). Note the following features for the selection criteria equipment, functional location and equipment of category Production resources/tools (PRT equipment):

Note that the system also selects a maintenance plan if additional maintenance items with other pieces of equipment or functional locations are assigned to it. This also applies for all selection criteria from the maintenance item.

If you use maintenance plans for pieces of PRT equipment in your company, you must set the indicator Use in PRT equipment in the initial run. The system thereby checks whether the maintenance plan is used in pieces of equipment. Check whether the equipment should be archived before the maintenance plan is archived, or delete the maintenance plan entered in the PRT equipment.