Use
You check the BOM for the generator component and the reference point for two components.
Prerequisites
The reference point ZECPP01 (IECPP: advance procurement for power plant) is maintained in Customizing for the Project System.
Procedure
Menu Path |
Logistics ® Central Functions ® Engineering ® Bill of Material ® Bill of Material ® Material BOM ® Display |
Transaction Code |
CS03 |
Field |
Data |
Material |
IECPP-2-GE01 |
Plant |
4000 |
BOM Usage |
1 |
The reference point ZECPP01 has been maintained in the General data area on the Basic data tab page.
The reference point ZECPP01 has been maintained.