Automatic Process Instruction Creation 
Use
You use this function to create process instructions if:

In control recipes for a specific destination, you want to transfer information on the allocated material components for each phase. The material components are defined in the material list of the process order. For this reason, the system can generate the corresponding process instructions and automatically enter the individual material data.
Prerequisites
The following settings have been made in Customizing for Process Management:
Features
You can generate the process instructions defined in the control recipe destination as follows:
In this case, the system triggers process instruction generation automatically.
It inserts the generated process instructions at the corresponding positions in the process order and control recipe.

You can only create the control recipe if a value has already been assigned to the process instruction characteristics in Customizing or if the value is assigned automatically. Otherwise, the process instructions are only copied to the process order where you must assign the missing values manually.
For information on automatic characteristic value assignment, see
If you want to check and, if necessary, change the generated process instructions before you create the control recipe, you can manually start process instruction generation in the process order. The system inserts the generated process instructions in the process order where you can maintain them as follows:
The system does not generates the process instructions again when you create the control recipe unless you have deleted all generated process instruction.
The following numbers are assigned to generated process instructions: