Unplanned Withdrawal of Components for an Order 
Use
You can withdraw materials for an order even if the materials are not listed as components in the order. These "unplanned withdrawals" cause the actual costs of the order to be updated.
Procedure
To carry out unplanned withdrawals for a process order, proceed as follows:
- the material number
- the quantity
- the quantity unit
Batch
If the material you want issued is subject to handling in batches, you will have to either enter a specific batch number or carry out batch determination. In order to perform batch determination, you must either:
- set up a batch search strategy or
- enter an asterisk (*) in the field Batch.
The system will find batches of this material, which you can then copy over to your list of items.