Creating Inspection Characteristics 

Use

Inspection characteristics are normally copied over from the master recipe. You can, however, create inspection characteristics in QM results recording. These are known as ‘unplanned’ inspection characteristics.

Procedure

  1. Call up the process order.
  2. Branch to the operation overview and select the operation to which you want to assign an inspection characteristic.
  3. Select the menu options Operation ® Functions ® Unplanned insp. char.

You can only create an inspection characteristic after an inspection lot has been created and saved for the order and after the order has been released.