Scheduling Master Recipes 

Prerequisites

The scheduling-relevant data has been maintained in the master recipe and in the resources and materials used (see Master Recipe Scheduling).

Procedure

  1. On the operation overview of your recipe, choose .
  2. The Scheduling dialog box appears.

  3. Enter the data required for scheduling and choose .
  4. You must enter a production version if you want to take the phase quantities determined in material quantity calculation into account.

  5. Select an overview variant for displaying the scheduling results and choose .

The system schedules the recipe and takes you to the scheduling overview. It contains the calculated dates displayed in the overview variant you have selected.

Result

The scheduling results are available in the system until you exit the master recipe. They are not saved along with the recipe.