Prerequisites
The scheduling-relevant data has been maintained in the master recipe and in the resources and materials used (see
Master Recipe Scheduling).Procedure
.The Scheduling dialog box appears.
.
You must enter a production version if you want to take the phase quantities determined in material quantity calculation into account.
.The system schedules the recipe and takes you to the scheduling overview. It contains the calculated dates displayed in the overview variant you have selected.
Result
The scheduling results are available in the system until you exit the master recipe. They are not saved along with the recipe.