Editing Inspection Results Requests in the PI Assistant 
Prerequisites
You have created the inspection results request in the master recipe and called the process instruction assistant (PI assistant); see
Editing Process Instructions in the PI Assistant.Procedure
To add an operation or phase:
Choose
Operation or
Phase.
To specify the operation or phase number:
To delete an operation or phase:
Select the characteristic and choose
Op./Ph.
Copy and save the master recipe.