Assigning Test Equipment to Inspection Characteristics 
Prerequisites
Production resources/tools (PRT) you want to use as test equipment must be assigned to the same operation or phase as the inspection characteristic in the master recipe.
Procedure
.
.The second dialog box containing control indicators appears.
.The system takes you back to the characteristic overview.
If you want to assign test equipment directly to the inspection characteristic:
.If you want to assign different pieces of test equipment for each header material/inspection characteristic combination:
Dependent characteristic specs.
, position the cursor on the material and choose Choose.