Go to the material list of your master recipe (Materials tab page).
If more than one header material and/or production version exists for your recipe, select the material or production version whose data you want to edit.
The material list appears.
Choose
.The screen where you can edit apportionment structures appears.
Enter a key and a description for the apportionment structure.
If you want to edit cost apportionment for cost elements, you must also enter an origin structure to which the required cost elements are assigned.
Position the cursor on the apportionment structure and choose Equivalence numbers.
The screen for equivalence number editing appears.
Make an entry for each co-product or each co-product and cost element (Assignment), if you have edited an origin structure.
For each entry, determine:
- How long it is valid
- The cost portion debited to it (equivalence number)
- Choose
.
The system takes you back to the material list.