Consumption-Based Planning (MM-CBP)
   Consumption-Based Planning
      Overview of the Main Transaction Codes for CBP
      MRP Procedures in Consumption-Based Planning
         Reorder Point Planning
            Reorder Point Planning Procedure
            Reorder Point Planning with External Requirements
         Forecast-Based Planning
            Forecast-Based Planning Procedure
         Time-Phased Planning
            Time-Phased Planning Procedure
            Range of Coverage Profile in Time-Phased Planning
            Time-phased Planning Process with Delivery Cycle
            Time-phased Planning Process with Reorder Point Planning
      Master Data
         Planning Calendar
            Creating Planning Calendars with Calculation Rule
            Creating Planning Calendars without Calculation Rule
            Changing the Planning Calendar
         Quota Arrangements
            Allocation Quota Arrangement
               Example for Allocation Quota Arrangement
            Splitting Quota Arrangement
               Example for Splitting Quota Arrangement
            Lot Size and Rounding Profile in Quota Arrangement
               Example for Maximum Lot Size
            Priority and Maximum Release Quantity per Period
               Example for Priority and Maximum Release Quantity
            Maintaining the Quota File
      Planning Processes
         Checking the Planning File
            Individual Customer Planning File Entries
            Planning Run Type
            Planning Mode
            Calculating Low-Level Codes
            Displaying the Planning File
            Setting Up the Planning File
            Creating Entries in the Planning File Manually
            Check the Consistency of the Planning File
         Net Requirements Calculation
            Net Requirements Calculation for Reorder Point Planning
            Net Requirements Calculation for Forecast-Based Planning
         Lot-Size Calculation
            Lot-Sizing Procedures
               Static Lot-Sizing Procedures
                  Lot-for-Lot Order Quantity
                  Fixed Lot Size
                  Replenishment up to Maximum Stock Level
               Period Lot-Sizing Procedures
                  Availability Date for Period Lot-Sizing Procedure
                     Example for Determination of Availability Date
                  Delivery Date Instead of Availability Date
                     Example for Delivery Date Instead of Availability Date
               Optimum Lot-Sizing Procedures
                  Part Period Balancing
                  Least Unit Cost Procedure
                  Dynamic Lot Size Creation
                  Groff Reorder Procedure
               Lot Sizes with Splitting and Overlapping
               Short-Term and Long-Term Lot Size
               Lot-for-Lot Remaining Order Quantity
            Rounding
               Rounding Profile
         Scheduling
            Backward Scheduling for External Procurement
               Example of Backward Scheduling for External Procurement
            Forward Scheduling for External Procurement
               Example of Forward Scheduling for External Procurement
         Determining the Procurement Proposal
            Procurement Type and Special Procurement Type
            Quota Arrangements
            Determining Source of Supply for External Procurement
            Shipping Notification
         Creation of Exception Messages
            Rescheduling Check
         Stock Transfer from Plant to Plant
            Planned Orders for Stock Transfer
         Storage Location MRP
            Planning Storage Location Stock Separately
            Excluding a Storage Location from MRP
         MRP Area
            Examples for Planning with MRP Areas
            Implementing MRP Areas
            Preparing for Material Requirements Planning with MRP Areas
               Converting the Planning File Entries
                  Planning File Entries for MRP Areas
               MRP Area Segments in the Material Master
                  Maintenance of Mass Data
            Planning Material Requirements with MRP Areas
               Material Requirements Planning with MRP Areas
                  Determining and Assigning Storage Locations to the MRP Area
                  Determine Source of Supply for Delivery Schedules for MRP Areas
               Stock Transfer from Plant to MRP Area
               Example: MRP for Two Storage Locations
      Carrying Out the Planning Run (PP-MRP-PR)
         Control Parameters for the Planning Run
            Planning Run Type in the Initial Screen
            Creation Indicator
            Creation Indicators in the Initial Screen and the MRP Group
            Planning Mode in the Initial Screen
            Scheduling Control in the Initial Screen
         Total Planning
            Carry Out Total Planning Online
            Execute Total Planning in Background Mode
            User Exit: Material Selection for the Total Planning Run
            Parallel Processing
         Carrying Out Single-Item, Single-Level Planning
            Working with the Planning Result
      Evaluating the Planning Result
         MRP List and Stock/Requirements List
            Material Requirements Planning
            Material Information
            Using Individual Access for Lists
            Using Collective Access for MRP Lists
            Using Collective Access for Stock/Requirements Lists
            Sorting Material Lists
            Creating Worklists
            Working with the Lists
               Searching for Information
               Filtering Information
               Working with List Header and Material Tree
               Individual Line Display
                  Individual Line Display
               Display of Period Totals
                  Display of Period Totals
               Working with Individual MRP Elements
               Working with Whole Lists
               Graphical Display
                  Graphical Display of Lists
               Comparing MRP List and Stock/Requirements List
               Printing Individual Lists
               Printing Several MRP Lists
               Navigation Between Information
            User-Specific Configuration of the Lists
               Settings
                  Configuring Access to the Lists
               Material Tree
                  Select Fields in the Tree
                  Sort/Group Fields in the Tree
               Flexible Transaction Calls
                  Define General Transaction Calls
                  Transaction Calls per MRP Element
               Traffic Lights
                  Define Traffic Lights
      Procurement Proposal (PP-MRP-PP)
         Planned Order
            Display Planned Order
            Create Planned Order Manually
            Change Planned Order
            Conversion of Planned Orders
               Converting Planned Orders into Purchase Requisitions
            Firming Procurement Proposals
               Planning Time Fence for Transmitted Schedule Lines Only
      Forecast Parameters
         Overview
         Forecast Models
         Model Selection
            Manual Model Selection
            Automatic Model Selection
            Manual Model Selection with Additional System Chec
         Model Initialization
         Ex-Post Forecast
         Parameter Optimization
         Maintaining Forecast Parameters
            Forecast Parameters: Independent of the Forecast M
            Forecast Parameters: Dependent on the Forecast Mod
         Creating Historical Data
         Creating Forecast Values
         Carrying out the Forecast with Reference to Anothe
      Maintaining Parameters Using Profiles
         Overview
         Creating a Profile
         Displaying a Profile
         Changing a Profile
         Deleting a Profile
         Where-Used List for Profiles
      Carrying Out the Forecast
         Overview
         Things to Think About Before Carrying out the Fore
         Forecast Options
            Carrying Out the Individual Forecast
            Carrying Out the Total Forecast
            Carrying Out the Total Forecast in Background Mode
         Calculating the Forecast Values
         Calculating the Safety Stock and the Reorder Level
         Ex-Post Forecast
         Monitoring the Selected Forecast Model
         How Does the System Optimize the Smoothing Factors
      Forecast Result
         Overview
            Checking the Forecast Result Using a List
            Checking the Forecast Result in Online Mode
            Changing the Forecast Result
      Significance of the Material Forecast for Material
         Material Forecast
            Reducing Forecast Requirements
            Effects on Consumption-Based Planning Procedures
            Splitting the Forecast Requirements
      Forecast Formulas
         Overview
         Moving Average Model
         Weighted Moving Average Model
         Principles of First-Order Exponential Smoothing
         Constant Model with First-Order Exponential Smoothing
         Trend and Seasonal Models with First-Order Exponential Smoothing
         Second-Order Exponential Smoothing
         Evaluating Forecast Accuracy
         Safety Stock Calculation
         Reorder Level Calculation