Use
To process design activities, you must carry out the following processes in the R/3 System:
Assign design documents
The documents are created in external system, the data required is entered in the R/3 System, and the documents are assignment to the appropriate activities in the project.
Confirmation of design activities
When design is complete, procurement is automatically released.
A worklist was assigned to user WF-PS-1 in the Sales and Distribution using Workflow section. It covers mechanical and electrical activities and activity elements.
Procedure
Field |
Data |
User |
WF-PS-1 |
Password |
WELCOME |
Language |
De,En,Fr,Sp |
Menu Path |
Logistics ® Project System ® Project ® Project Planning Board ® Change Project |
Transaction Code |
CJ2B |
Field |
Data |
Project definition |
E-# # # # |
Plan.board prf |
Elevators |
w. activities |
Select |
You see the graphical overview of the entire project.
A dialog box appears, showing an overview of the documents linked to the activity.

Information on the design documents created in external systems has already been entered in R/3 document management. You assign the technical drawing using the appropriate document.
Field |
Data |
Type |
DOC |
Document |
PS-ENG-000-00001 |
You see the basic data screen for the assigned document.
The Originals frame shows the references to the original files.
The original document is stored in two different file formats.
From the R/3 System, you can start an application on your computer to display the documents. See the Document Management documentation for details of the relevant prerequisites.
You see the storage data for the originals. The originals of this document are copied to the SAP database. For example, a database server may be specified, specifying file path and the name of the original file.
To display the original screen, you require:
Final Confirmation of Design Activities
Use
The design activities for the cabin cannot start until the design activities for the electrical and mechanical components are complete.
To make this example easier, confirm activity 1070 (Cabin design) now. This releases all the activities in all the project phases from the procurement phase for processing.
Procedure
Menu Path |
Office ® Workplace |
Transaction Code |
SBWP |
The work item is opened in the right-hand side of the screen.
The collective confirmation, with the design activities to be prorcessed, is accessed automatically.
The work item is flagged as complete.