Adding Planned Orders and Process Orders 
Use
You can use this procedure to include existing planned orders and process orders in a production campaign.
Prerequisites
The planned and process orders must have already been created outside of the campaign.
Procedure
The Change Production Campaign: Overview screen appears.
You can add orders while creating a campaign on this screen.
All of the orders in the campaign are listed that:
– Were created for the material that is to be produced with the campaign
– Are within the time period specified by the validity start and validity finish of the campaign
– Do not yet have the status of being completely confirmed or technically completed (for process orders)
– Are not yet part of another production campaign
Result
All process orders in the campaign have the status "Production campaign" (PCMN) and are therefore not available for other campaigns.