Defining Assembly Items for BOM Transfer 

Use

Use transfer control to define components as assembly items in BOM transfer.

The transfer control has two functions:

Procedure

  1. Choose Logistics or Accounting ® Project System ® Material ® Planning ® BOM transfer.
  2. Choose Transfer.
  3. Enter the project in which you want to assign an assembly item.
  4. Enter the material and reference point.
  5. Save your data.

Result

If you assign the material defined as an assembly item to an activity using BOM transfer, the system automatically enters an negative quantity.

The reference point of the assembly items is passed on to all the lower-level BOM items.